Mozal, Mosambique

JOHN SISK & SON

Aluminum processing plant.

The Anode Rodding and Assembly areas consisted of numerous plinths with bolts case in then and surface beds. A steel structure was then bolted on top. The Gas Treatment Center consisted of a silo, smaller plinths with bolts.

Setout for earthworks.
Setout bases and positioned 1.2m bolts in plinths.
Set out silo positions as well as bolts case in the walls of the silos.
Asbuilt survey of steel structure erected on the plinths.